Bury Green was acquired by Matterhorn Capital Data Centres in October 2010. The site is located in a discreet and secluded area approx three miles from the town of Bishops Stortford and is 11.5 acres.

Each data centre is a two storey building, the ground and first floors each house mechanical and electrical plant and two data halls. The four individual data halls each are 10,000 sq ft giving a total nett technical area of 40,000 sq ft per building. A two storey ancillary accommodation block housing security, loading bay, offices and toilets is located at the front of each building.

The site is prepared ready for construction to commence in early 2012. Each data hall has dedicated mechanical and electrical infrastructure which supports an IT load of 1500 kW per hall.

The site will be fully secure with fencing around the entirety of the perimeter and security gatehouse at the vehicular and pedestrian entrance to the site.